Skip to main content

New construction · Long Beach

How does coastal review affect new construction in Long Beach?

New construction inside Long Beach's coastal zone requires a Coastal Development Permit in addition to the standard building permit. Coastal Zone applies to Naples, Belmont Shore, Peninsula, and downtown waterfront; CDP required.

What changes the answer in Long Beach.

Coastal Zone applies to Naples, Belmont Shore, Peninsula, and downtown waterfront; CDP required. Coastal Development Permit required in Coastal Zone (Naples, Belmont Shore, Peninsula); Cultural Heritage Commission review for designated districts.

  • Coastal Zone applies to Naples, Belmont Shore, Peninsula, and downtown waterfront; CDP required.
  • Coastal Development Permit review timeline
  • View / bluff / sand setback constraints
  • Coastal Development Permit required in Coastal Zone (Naples, Belmont Shore, Peninsula); Cultural Heritage Commission review for designated districts.

Source-backed note

City of Long Beach Development Services — Building & Safety coordinates with the California Coastal Commission (or local CDP authority under a certified LCP) on coastal-zone projects.

Reference: California Coastal Commission — Coastal Development Permits California Coastal Commission

Local authority: City of Long Beach Development Services — Building & Safety

Get a Long Beach-specific answer for your parcel.

Send us the address and we'll respond with a feasibility note that cites City of Long Beach Development Services — Building & Safety and the parcel's actual constraints — not a generic checklist.

Alpha Dream Construction — licensed California general contractor.

request a quote

Tell us what you’re building.

A few specifics — city, scope, budget, target date. We’ll come back with a one-page feasibility note within the week.

Phone or email — at least one so we can reply.

We use this to route your lead to the right studio. No spam, ever.

Made it this far?After hours · reply first thing tomorrow

Then you're serious. Let's put it on a clipboard.

  • 10-minute call with the foreman
  • We tell you what your build actually costs, today
  • No follow-up unless you ask

Free · Same-week scheduling

Contact form · 30 seconds

or call (818) 650-3197

No spam. We reply personally — usually within 3 hours.

Call