Skip to main content

New construction · San Rafael

How does the wildfire (WUI) zone affect new construction in San Rafael?

San Rafael parcels in a Fire Hazard Severity Zone must meet California Building Code Chapter 7A — ignition-resistant exteriors, ember-resistant vents, Class A roofing, and defensible space. Hillside parcels across Sun Valley, Dominican, and Peacock Gap are in VHFHSZ — Chapter 7A and Marin defensible-space rules apply.

What changes the answer in San Rafael.

Hillside parcels across Sun Valley, Dominican, and Peacock Gap are in VHFHSZ — Chapter 7A and Marin defensible-space rules apply. Site access in San Rafael can require temporary street-use or encroachment permits depending on street width, on-street parking restrictions, and proximity to schools or transit corridors.

  • Hillside parcels across Sun Valley, Dominican, and Peacock Gap are in VHFHSZ — Chapter 7A and Marin defensible-space rules apply.
  • Chapter 7A material requirements
  • Defensible-space inspection prior to final
  • Site access in San Rafael can require temporary street-use or encroachment permits depending on street width, on-street parking restrictions, and proximity to schools or transit corridors.

Source-backed note

Cal Fire and City of San Rafael Community Development Department — Building Division jointly verify Chapter 7A compliance; the parcel's official FHSZ designation is the controlling input.

Reference: Cal Fire — Fire Hazard Severity Zones Cal Fire / OSFM

Local authority: City of San Rafael Community Development Department — Building Division

Get a San Rafael-specific answer for your parcel.

Send us the address and we'll respond with a feasibility note that cites City of San Rafael Community Development Department — Building Division and the parcel's actual constraints — not a generic checklist.

Alpha Dream Construction — licensed California general contractor.

request a quote

Tell us what you’re building.

A few specifics — city, scope, budget, target date. We’ll come back with a one-page feasibility note within the week.

Phone or email — at least one so we can reply.

We use this to route your lead to the right studio. No spam, ever.

Made it this far?After hours · reply first thing tomorrow

Then you're serious. Let's put it on a clipboard.

  • 10-minute call with the foreman
  • We tell you what your build actually costs, today
  • No follow-up unless you ask

Free · Same-week scheduling

Contact form · 30 seconds

or call (818) 650-3197

No spam. We reply personally — usually within 3 hours.

Call