How long does it take to build an ADU in California?

Door-to-door, a California ADU takes 9–18 months: 2–4 months of design and engineering, 2–4 months in permit review, and 4–10 months of construction. Garage conversions run shorter (5–8 months total); two-story detached builds the longest.

State law requires ministerial review for compliant ADUs, with a 60-day decision clock once a complete application is submitted. Real-world plan-check times vary 4–16 weeks depending on jurisdiction backlog and corrections cycles.

Construction time depends on lot access, weather windows, and trade availability. Foundation and framing dominate the first half; trades, drywall, and finishes the second.

Keep reading

Related questions

  • How long does ADU plan check take in Los Angeles?
  • Can I speed up ADU permitting?
  • What's the typical garage conversion timeline?
Made it this far?Leo's on site · replies in ~3h

Then you're serious. Let's put it on a clipboard.

  • 10-minute call with the foreman
  • We tell you what your build actually costs, today
  • No follow-up unless you ask

Free · Same-week scheduling

Contact form · 30 seconds

or call Leo →

No spam. We reply personally — usually within 3 hours.

Call