New construction · Malibu
How long does new construction take in Malibu?
New construction in Malibu typically follows a 10-phase sequence — feasibility, design, entitlements, plan check, permit issuance, sitework, foundation, framing/MEP, finishes, and final inspections. Local plan-check queues at City of Malibu Building Safety and Malibu-specific risk factors are the main schedule levers; we publish the city's phase-by-phase timeline rather than a generic month count.
What changes the answer in Malibu.
Schedule risk in Malibu is concentrated in: Coastal Development Permit review; ESHA and biology surveys (seasonal); OWTS percolation and design approval. City plan check coordinates with LA County Fire (Code 32 / fuel modification), Geology, and OWTS (onsite wastewater) reviews.
- Coastal Development Permit review
- ESHA and biology surveys (seasonal)
- OWTS percolation and design approval
- LA County Fire fuel-mod plan
- Planning Commission hearings
Source-backed note
Plan check and inspection cadence is published by City of Malibu Building Safety; entitlement review (where required) runs in parallel with design.
Local authority: City of Malibu Building Safety
Get a Malibu-specific answer for your parcel.
Send us the address and we'll respond with a feasibility note that cites City of Malibu Building Safety and the parcel's actual constraints — not a generic checklist.
Alpha Dream Construction — licensed California general contractor.
Then you're serious. Let's put it on a clipboard.
- 10-minute call with the foreman
- We tell you what your build actually costs, today
- No follow-up unless you ask
Free · Same-week scheduling