LA siding — three-coat stucco the regional standard, fiber-cement on contemporary homes. Tear-off to sheathing, new weather barrier, re-side.

Westside permits move quickly when the parcel is clearly inside the city of LA or Santa Monica grid — both jurisdictions run ministerial ADU review under state law. The variables are Coastal Zone status (anything west of Lincoln Blvd in Venice / Marina Peninsula), and whether a soft-story or seismic ordinance applies to the existing structure.

Westside cost band — 2026

$10 – $22 / sqft

Stucco bottom; fiber-cement and wood top.

Westside permit clock

812 weeks ministerial

2–4 weeks for full re-side on a 1,800 sqft house.

Scope — start to keys.

  • Tear-off
  • Sheathing repair
  • Weather barrier + lath
  • Stucco or siding install
  • Trim + paint

What changes about the permit here.

  1. City of LA parcels: LADBS ePlanLA portal, ministerial ADU review under LAMC §12.22-A,33.
  2. Santa Monica parcels: SMMC §9.31.300 — locally streamlined, similar 60-day clock as state law.
  3. Coastal Zone (Venice west of Lincoln, Marina Peninsula): Coastal Development Permit may be required.
  4. Mello Act applies to demolition or replacement of existing residential units in the Coastal Zone.

What moves the Westside number.

  • Westside labor and dump fees price 8–12% above LA County median.
  • Coastal Zone parcels often add $15–40k in CDP consultant + biology survey costs.
  • Santa Monica seismic retrofit pairing on a duplex can add $35–80k tied to the ADU permit cycle.
  • Tight street parking (Venice, Mar Vista) drives crane / pump days higher than Valley jobs.

In short.

How much does stucco re-side cost in LA?
$10–$16/sqft three-coat. $18–$22 for fiber-cement.
Can you patch and match LA stucco?
Yes — color and texture match for repair patches.
Do I need a Coastal Development Permit for a Westside ADU?
Only if the parcel is inside the Coastal Zone — generally west of Lincoln Blvd in Venice and the Marina Peninsula. Inland Westside parcels (most of Santa Monica, Brentwood, Mar Vista east of Lincoln) do not.
Can I build an ADU in Santa Monica's R1?
Yes. SMMC §9.31.300 mirrors state ADU law on R1, R2, and multifamily lots, with ministerial 60-day review once the submittal is complete.

More we build in Westside.

Siding & Stucco in nearby LA areas.

Got a Westside project in mind?

Send us the address and we’ll pull Westside zoning, setbacks, and siding & stucco feasibility before you spend on drawings.

Start a Westside project →
Call