Skip to main content

Hills & Canyons ADU Builder.

We design, permit, and build accessory dwelling units across Greater Los Angeles — detached backyard ADUs, attached additions, garage conversions, and JADUs. One team, one number to call, from the first feasibility walk through the final LADBS inspection.

Hill parcels add the Baseline Hillside Ordinance, geotech, and (along the ridgeline) the Mulholland Scenic Parkway Specific Plan to every permit package. The ADU itself is still ministerial, but plan-check takes longer because the structural, grading, and haul-route sheets are heavier than a flat-lot project.

Hills & Canyons cost band — 2026

$550 – $800 / sqft installed

Lot access, slab condition, panel upgrade, and finish level move the number most. Pre-approved plans trim 5–10%.

Hills & Canyons permit clock

1218 weeks ministerial

Plan on 3–5 months for design + LADBS permit, then 4–6 months on-site for an 800–1,000 sqft detached ADU.

Scope — start to keys.

  • Site walk, feasibility note, and zoning / LAR1 / RD overlay check
  • Full architectural plan set, structural, MEP, Title 24 energy
  • LADBS or local-city permit submittal and back-and-forth
  • Foundation, framing, MEP rough, finishes, landscape tie-in
  • Final inspection, certificate of occupancy, and warranty

What changes about the permit here.

  1. BHO caps height to ~33 ft and limits grading cuts based on lot slope.
  2. Soils / geotech report required on any slope >10%.
  3. Hillside Construction Regulation permits gate haul-route hours and truck size.
  4. Beverly Hills + Bel-Air HOA / R1 design review runs parallel to building permit.

What moves the Hills & Canyons number.

  • Slope-driven foundation work commonly $80–250k above flat-lot equivalent.
  • Crane / pump days run 2–4× a Valley job — narrow streets and switchbacks.
  • Caissons on steep slopes can hit $1,500–4,000 per linear foot of depth.
  • Beverly Hills design review pushes cladding budgets up sharply.

In short.

How much does an ADU cost in Los Angeles in 2026?
Most detached LA ADUs land between $300K and $500K all-in. Garage conversions typically run $160K–$260K. We hand over a one-page feasibility note with a real number before any contract.
Do you handle LADBS permits?
Yes — full plan set, structural calcs, Title 24 energy compliance, and the LADBS back-and-forth so the homeowner only signs at the milestones.
Can I build an ADU in a hillside zone?
Usually yes, but Hillside Ordinance grading and access rules add design time. We've built in Silver Lake, Mt. Washington, Hollywood Hills, and the Palisades — geotech and shoring are part of the workflow.
Does the Baseline Hillside Ordinance kill my ADU?
Almost never. State ADU law overrides local FAR limits up to 800 sqft, and many hillside lots can fit a full 1,200 sqft attached ADU even under BHO.
How much does hillside geotech add?
Plan on $8–25k for the report itself. The downstream cost — caissons, retaining walls, deeper foundations — is where the real budget impact lives.

More we build in Hills & Canyons.

ADU Builder in nearby LA areas.

Got a Hills & Canyons project in mind?

Send us the address and we’ll pull Hills & Canyons zoning, setbacks, and adu builder feasibility before you spend on drawings.

Start a Hills & Canyons project →
Call