Skip to main content

Prevailing Wage

Government-set hourly wage that public works contractors must pay each trade.

California Labor Code §1771 requires contractors on most public works projects over $1,000 to pay each trade the prevailing wage rate set by the Department of Industrial Relations. Prevailing wage typically runs 30–60% above market on residential rates.

Private residential remodels are exempt. Mixed-use, affordable-housing, and government-funded projects often trigger prevailing wage.

Related terms

People also ask

FAQ — Prevailing Wage

What does "Prevailing Wage" mean in plain English?
Government-set hourly wage that public works contractors must pay each trade. Browse the full construction glossary for related terms.
Why does Prevailing Wage matter for a California ADU or remodel?
Prevailing Wage comes up in the construction and field practice side of nearly every Greater LA and Bay Area project we touch. California Labor Code §1771 requires contractors on most public works projects over $1,000 to pay each trade the prevailing wage rate set by the Department of Industrial Relations. Getting it right at design saves rework later — getting it wrong is one of the most common reasons permits stall. See how it lands in our five-phase process and the relevant field guides.
Where will I see Prevailing Wage on my own project?
Most owners run into Prevailing Wage during the design or plan-check phase — specifically inside schematic design or permit submittal. Your project manager flags it on the schedule, walks you through what the city expects, and confirms documentation is in place before the inspection that depends on it.
Does Prevailing Wage cost extra?
Sometimes — depends on whether it adds scope (a report, a structural detail, a fee) or just a paperwork step. Anything cost-impacting is itemized in your contract or change order, never buried in the invoice. Sanity-check your number with the ADU cost calculator and the 2026 cost report.
Who at Alpha Dream handles Prevailing Wage?
The project architect owns design-level decisions; the permit runner owns city interactions — see the California permit directory; the project manager owns field execution. You always know who to ask. Start a conversation on the contact page.
When does Prevailing Wage typically come up in the project schedule?
Most often during permit submittal or early construction. The full sequence is on the process page.
Is Prevailing Wage handled differently in LA vs the Bay Area?
Yes — local interpretation varies. The LA studio and Bay Area studio note the regional shifts on each city hub.
What documents prove compliance with Prevailing Wage?
City-specific — the California permit directory lists the form set per jurisdiction. Field journal entries show what actually clears plan check.
Which trades or consultants own Prevailing Wage on a typical job?
Architect, structural engineer, or Title 24 consultant — depends on the term. The process page maps roles across the five phases.
How does Prevailing Wage affect the project budget?
Direct line item in the contract when it triggers a report, detail, or fee. Pricing bands are in the 2026 cost report.
Has Prevailing Wage changed recently under California law?
California ADU and remodel law has shifted every legislative session since 2017. Material changes land first on the field journal; definitions update quarterly here.
Where can I read the underlying statute for Prevailing Wage?
Each glossary entry cites the relevant Gov Code, building code section, or city bulletin. The permit directorylinks the source portals.
Which ADU type is Prevailing Wage most relevant to?
Cross-references live on the ADU types index. The term often appears in detached ADU and JADU contexts most.
Can I send Prevailing Wage questions to your team?
Yes — use the contact page. We add the most-asked questions to the site-wide FAQ monthly.
What's a related term I should also read after Prevailing Wage?
Each entry cross-links 3–5 related terms. Browse the full set on the glossary index.
Plain EnglishLeo's on site · replies in ~3h

Need "Prevailing Wage" explained against your project?

  • Pull up your plans, we'll mark them up live
  • No jargon, no sales pitch
  • Free, even if you never hire us

Free · Phone or Zoom

Contact form · 30 seconds

or call Leo →

No spam. We reply personally — usually within 3 hours.

Call