California Construction Permit Directory

Every jurisdiction we file in, in one place. Click through to the actual portal — not a wrapper, not an affiliate. We update the timelines and fee ranges quarterly from jobs we've personally submitted.

City of Los Angeles

Los Angeles area · Municipal

Open LADBS online services
Typical plan-check timeline
1018 weeks
Typical ADU permit + impact fees
$8,500–$22,000

ADU notes · Standard Plan Program offers preapproved detached ADU sets that cut review to ~4 weeks. JADUs are restricted to within the existing dwelling envelope. No owner-occupancy through 2025.

Structural · Hillside Ordinance applies above the BHO line — adds geotech and grading review. Soft-story retrofit required for many pre-1978 multifamily.

Los Angeles County (unincorporated)

Los Angeles area · County (unincorporated)

Open EPIC-LA self-service portal
Typical plan-check timeline
816 weeks
Typical ADU permit + impact fees
$7,500–$19,000

ADU notes · Unincorporated LA County uses a streamlined ADU plan check. School fees collected at final inspection — budget separately.

Structural · Fire Hazard Severity Zone overlays apply in foothills — ignition-resistant construction required.

Beverly Hills

Los Angeles area · Municipal

Open Beverly Hills Building Division
Typical plan-check timeline
1422 weeks
Typical ADU permit + impact fees
$14,000–$32,000

ADU notes · Hillside R-1 lots have strict grading limits. Discretionary design review for any exterior changes visible from a public street.

Structural · Mansionization ordinance limits FAR — confirm before adding any second-story addition.

Pasadena

Los Angeles area · Municipal

Open Pasadena Accela portal
Typical plan-check timeline
1016 weeks
Typical ADU permit + impact fees
$8,500–$21,000

ADU notes · Landmark District overlays require Design Commission review for exterior work on contributing properties — adds 4–8 weeks.

Long Beach

Los Angeles area · Municipal

Open LB ePlus permit portal
Typical plan-check timeline
814 weeks
Typical ADU permit + impact fees
$6,500–$17,000

ADU notes · Citywide preapproved ADU plan set available — review can close in 3–5 weeks. Coastal zone (Belmont Shore, Naples) adds Commission review.

Burbank

Los Angeles area · Municipal

Open Burbank permits portal
Typical plan-check timeline
814 weeks
Typical ADU permit + impact fees
$6,500–$17,000

ADU notes · ADU rear-yard setbacks reduced to 4 feet per state law. Streamlined plan check for under-750-sqft units.

Open SF DBI Permit Tracking
Typical plan-check timeline
1428 weeks
Typical ADU permit + impact fees
$12,000–$38,000

ADU notes · ADU + state-density bonus pathway is the fastest route. Mandatory neighborhood notification adds 30 days for many projects.

Structural · Mandatory soft-story retrofit applies to wood-frame buildings with 5+ units and ≥3 stories built before 1978.

Oakland

Bay Area · Municipal

Open Oakland Accela portal
Typical plan-check timeline
1222 weeks
Typical ADU permit + impact fees
$9,500–$26,000

ADU notes · Pre-approved ADU plans available. Wildland-Urban Interface zones in the hills require ember-resistant construction.

Structural · Soft-story retrofit program active — confirm parcel status before purchase.

Berkeley

Bay Area · Municipal

Open Berkeley permits
Typical plan-check timeline
1424 weeks
Typical ADU permit + impact fees
$10,000–$28,000

ADU notes · All-electric reach code — no new gas connections. Landmarks Preservation review required in many districts.

San José

Bay Area · Municipal

Open San José Accela
Typical plan-check timeline
1018 weeks
Typical ADU permit + impact fees
$8,500–$22,000

ADU notes · Master ADU Program offers 17 preapproved plan sets — 3-week plan check. Garage conversions exempt from many setbacks.

Fremont

Bay Area · Municipal

Open Fremont permits
Typical plan-check timeline
916 weeks
Typical ADU permit + impact fees
$7,500–$19,000

ADU notes · Streamlined ADU review under 800 sqft. Mission San Jose district has historic overlays — confirm before exterior work.

Hayward

Bay Area · Municipal

Open Hayward Accela
Typical plan-check timeline
814 weeks
Typical ADU permit + impact fees
$6,500–$16,500

ADU notes · ADU fee waivers for units under 750 sqft. Hayward Fault zones require geotech for new foundations.

San Mateo

Bay Area · Municipal

Open San Mateo permits
Typical plan-check timeline
1017 weeks
Typical ADU permit + impact fees
$9,000–$22,000

ADU notes · Reach code requires all-electric appliances. Hillside review applies in Sugarloaf and Hayward Park.

Marin County (unincorporated)

Bay Area · County (unincorporated)

Open Marin County permits
Typical plan-check timeline
1222 weeks
Typical ADU permit + impact fees
$9,500–$25,000

ADU notes · ADU streamlining for units ≤1,200 sqft. Septic system capacity is the most common deal-breaker on unincorporated parcels.

Structural · WUI fire zones cover most of the county — Class A roof + ember-resistant vents required.

Call