California Interior & Exterior Painting.
LA painting — interior, exterior, cabinet refinish. Sherwin-Williams + Benjamin Moore systems, 5-year workmanship warranty.
Bay painting — exterior prep is the work in fog-belt cities. Power-wash, scrape, prime, two top coats, warrantied.
Los Angeles
$3 – $9 / sqft interior; $4 – $11 / sqft exterior
Walls only bottom; full surface incl. trim top.
Timeline — 3–5 days interior; 5–10 days exterior.
Los Angeles Interior & Exterior Painting →San Francisco Bay Area
$4 – $11 / sqft interior; $5 – $14 / sqft exterior
Bay labor + weather windows lift cost.
Timeline — 4–6 days interior; 7–12 days exterior.
San Francisco Bay Area Interior & Exterior Painting →Scope — what we deliver.
- Surface prep
- Repair + caulk
- Prime
- Two finish coats
- Cleanup + warranty
Permits look different in LA vs the Bay.
Los Angeles — permit notes
- No permit.
- Lead-safe RRP on pre-1978 homes.
- HPOZ color review possible.
Bay Area — permit notes
- No permit.
- Lead-safe RRP on pre-1978 homes.
- Historic district color review (SF, Berkeley).
How we think about interior & exterior painting.
Interior remodels live or die in the rough-in. The work nobody sees — venting, framing corrections, blocking, electrical layout, plumbing slope — is what makes a kitchen feel solid in year 10. We refuse to skip a wall opening if it lets us actually inspect what's behind it.
We sequence trades around moisture and dust, not the other way around. Tile + waterproofing get their own dry day. Cabinets get installed against a perfectly plumb, perfectly painted wall — never the reverse. Floors go in after cabinets so the dishwasher doesn't trap them.
The detail that separates a $40K kitchen from a $120K kitchen is rarely the cabinet brand. It's the alignment: drawer-to-drawer reveals, perfectly equal panel returns, integrated lighting, hidden hinges, soft-closing everything. We obsess over alignment because that's what the eye reads as quality.
The schedule, written out.
Week 0
Measure + design intent
Laser site survey, photo as-builts, plumbing + electrical investigation, scope-of-work + budget tier alignment.
Week 1–3
Design + selections
Plans, elevations, cabinet shop drawings, tile + stone + appliance + plumbing selections locked.
Week 3–6
Permits + procurement
City permit for structural / MEP work, lead times locked on cabinets, stone slabs reserved.
Week 6–8
Demo + rough
Selective demo, framing changes, plumbing + electrical rough-in, HVAC adjustments, inspections.
Week 8–10
Drywall + paint primer
Insulation where opened, drywall, level-5 finish where appropriate, primer coat.
Week 10–12
Tile + cabinets
Waterproofing, tile, cabinet installation, counter template the day cabinets are level.
Week 12–14
Stone + plumbing + appliance
Stone install, plumbing trim, appliances installed and tested, lighting trim.
Week 14–16
Punch + close-out
Touch-up paint, hardware, deep clean, owner walk, warranty registration, manuals binder.
Materials & assemblies.
| Component | Default spec | Why |
|---|---|---|
| Cabinet boxes | ¾" plywood, all-plywood or full-overlay framed, soft-close hardware, dovetail drawers | Particle-board boxes save 10–18% and fail in year 6 at the sink base. |
| Countertops | Quartz (Caesarstone, Cambria, Silestone) or natural stone with proper sealing | Quartz wins on durability; natural stone wins on character. |
| Plumbing supply | Type-L copper or PEX-A home-run manifold | PEX-A with a manifold is faster, freeze-tolerant, and easier to repair. |
| Waterproofing (showers) | Schluter-Kerdi or equivalent sheet membrane over cement board | Liquid-applied membranes work, but sheet is more forgiving on a 14-day install schedule. |
| Underlayment + flooring | Engineered hardwood ≥ 4mm wear layer, or porcelain tile rated PEI 4+ | Solid hardwood + radiant + slab = cupping; engineered is the right choice in CA climates. |
| Range hood | External-vented, sized at 100 CFM per linear foot of cooktop | Recirculating hoods don't move grease or moisture — never spec them on a gas range. |
Hidden costs we flag up front.
| Line item | Range | When it hits |
|---|---|---|
| Knob-and-tube or aluminum rewire | $8K–$28K | homes built pre-1970, opened walls reveal it |
| Galvanized supply replacement | $6K–$24K | low pressure + rusty water tells you before demo |
| Asbestos / lead abatement | $2K–$12K | popcorn ceilings + pre-1978 paint disturbed |
| Subfloor replacement | $3K–$14K | moisture damage at sink, dishwasher, or exterior wall |
| HVAC re-balance | $1.5K–$6K | new layout changes register count or duct geometry |
cheaper alternatives
What we'd consider — and what we wouldn't.
Cabinet refacing
30–45% cheaper, but boxes still date the kitchen and you can't change the layout.
IKEA + third-party fronts (Semihandmade etc.)
Good budget play under $50K total, but limited depth + lead times can derail the schedule.
Big-box installer
Cheaper labor, but subs rotate weekly — punch lists never close cleanly.
pitfalls — takeover-job patterns
Mistakes to avoid.
- Demoing before permits are in hand — a stop-work order resets the schedule by 4–8 weeks
- Locking finishes after demo starts — every selection change becomes a change order
- Skipping a moisture meter on the subfloor — laying new flooring over 18%+ moisture guarantees a callback
- Under-spec'ing the range hood — California gas-cooktop ventilation requirements are stricter than most installers think
Interior & Exterior Painting — Los Angeles.
Westside Interior & Exterior Painting
Local scope + permit →
Eastside / NELA Interior & Exterior Painting
Local scope + permit →
San Fernando Valley Interior & Exterior Painting
Local scope + permit →
South Bay Interior & Exterior Painting
Local scope + permit →
Hills & Canyons Interior & Exterior Painting
Local scope + permit →
San Gabriel Valley Interior & Exterior Painting
Local scope + permit →
Ventura County Interior & Exterior Painting
Local scope + permit →
Orange County Interior & Exterior Painting
Local scope + permit →
Inland Empire Interior & Exterior Painting
Local scope + permit →
Interior & Exterior Painting — Bay Area.
Oakland Interior & Exterior Painting
Local scope + permit →
Berkeley Interior & Exterior Painting
Local scope + permit →
Richmond Interior & Exterior Painting
Local scope + permit →
San Jose Interior & Exterior Painting
Local scope + permit →
Sunnyvale Interior & Exterior Painting
Local scope + permit →
Palo Alto Interior & Exterior Painting
Local scope + permit →
San Francisco Interior & Exterior Painting
Local scope + permit →
Fremont Interior & Exterior Painting
Local scope + permit →
Walnut Creek Interior & Exterior Painting
Local scope + permit →
Livermore Interior & Exterior Painting
Local scope + permit →
In short.
- Cost to paint LA house exterior?
- $7K–$18K for 2,000 sqft single-story.
- Cabinet repaint cost?
- $3.5K–$7K for a 25-door kitchen.
- Bay exterior paint cost?
- $10K–$25K for 2,000 sqft. Fog-belt prep is the variable.
- Cabinet painting in SF?
- $4K–$9K. Shop-spray finish for the cleanest result.
Stay in the same trade
Related interior remodeling services.
Same service, other region
Interior & Exterior Painting across California.
Authority sources
Interior & Exterior Painting — official California resources.
Primary sources we cross-reference on every project — agencies, utilities, and code bodies whose decisions actually move your permit and budget.
Department of Housing & Community Development
California Building Standards Commission
BSC
ICC Digital Codes (free read-only)
International Code Council
Read the full California Residential & Building Code online at no cost.
U.S. Census Bureau
Harvard JCHS Remodeling research
Joint Center for Housing Studies
National Institute of Standards and Technology
U.S. Green Building Council
Ready to scope a California interior & exterior painting project?
Send us the address. We’ll pull zoning, setbacks, and feasibility before you spend money on drawings — and the inquiry routes straight to the California desk.
Talk to the California desk →Want a real number for your Painting job?
- We open the books on similar jobs from the last 24 months
- Hand-built estimate, not a software auto-quote
- Includes permits, finishes, and the boring stuff
3-day turnaround · Free