Skip to main content

Two things,
done well.

We build two kinds of work in Greater LA: remodels of homes that deserve another fifty years, and ADUs that turn a backyard into rent, family room, or both. Design, permits, and build under one roof — one superintendent on-site daily.

Remodels.

Most of our remodel work happens in Santa Monica, Pasadena, Burbank, and the Westside — Spanish revivals, Craftsman bungalows, mid-century post-and-beam, and post-war ranches. We self-perform framing and finish carpentry, and we keep the same superintendent on your job from demo to handover.

  • Item R-01

    To the studs, when it's time.

    Whole-home remodels

    Spanish revivals, post-war Craftsman, mid-century ranches. Seismic upgrades, layout rework, plumbing and electrical pulled and reset. One project superintendent on-site every working day.

    • Seismic & foundation upgrades
    • Whole-house re-pipe & re-wire
    • Window, roof, siding replacement
    • Historic-district compliant restorations
  • Item R-02

    Walls come down. Light comes in.

    Kitchen re-imagining

    Honest cabinetry, soft-close everything, the appliance package you actually want. Three local cabinet shops on rotation; we never spec from a big-box catalog.

    • Custom millwork from LA cabinet makers
    • Stone fabricated locally — Heath, Fireclay, slab yards
    • Integrated paneled appliances when wanted
    • Permitted electrical & gas re-routes
  • Item R-03

    Skylights, steam, stone.

    Bath sanctuaries

    Built for the next twenty years of mornings. Wet-room layouts, curbless showers, radiant floors. Schluter Kerdi, two coats, every single time.

    • Curbless wet rooms
    • Radiant heated floors
    • Schluter waterproofing system
    • Custom vanity millwork
  • Item R-04

    More house, same lot.

    Additions & second-story pop-ups

    Bump-outs, rear additions, second-story additions. We thread the needle on setbacks, FAR limits, and historic review so the new work reads like it was always there.

    • Rear & side additions
    • Second-story additions on existing foundation
    • FAR & setback feasibility before you commit
    • Tied-in foundations and roof framing

ADUs.

California opened the door wide on ADUs — SB-9, AB-2221, and a stack of follow-ons mean most single-family lots in Greater LA can now host one (sometimes two) accessory units. Local rules still vary lot-to-lot. We translate the law into what your specific parcel allows before you commit a dollar.

By the numbers —

Typical sqft
400–1,200
Permit time
4–10 weeks
Build time
14–22 weeks
Starting at
$285k

Will an ADU fit on your lot?

Four quick questions. We'll tell you what's likely buildable, how the permit path changes for your city, and the right next step — no email required to see the answer.

Step 01

What kind of lot is it?

Step 02

Anything already on the lot we could convert?

Step 03

Roughly how big is the lot?

Step 04

Which area is the property in?

Answer the four above and the recommendation lands here.

  • Item A-01

    A small house, freestanding.

    Detached new-build ADU

    Cedar, cement-board, or stucco. Slab-on-grade or pier foundation. Up to 1,200 sqft per state law, with full kitchen, bath, and laundry. Solar- and EV-ready as standard.

    • Up to 1,200 sqft, two stories where allowed
    • Heat-pump HVAC + heat-pump water heater
    • Title 24 energy compliance in-house
    • Solar-ready, EV-ready conduit on day one
  • Item A-02

    The cheapest way in.

    Garage conversion ADU

    Existing footprint, new everything inside. Ministerial approval in most jurisdictions — usually no setback or parking review. Vault the ceiling and add skylights for the daylight a garage never had.

    • Ministerial approval where eligible
    • Slab insulation + radon mitigation when needed
    • Vaulted ceilings & skylights for daylight
    • Compact wet-bath + kitchenette layouts
  • Item A-03

    Share a wall, save a slab.

    Attached ADU & bump-outs

    Carved out of the existing house or bumped out the side or rear. Cheaper utility runs, faster schedule, fewer foundations. Best for lots that won't fit a detached unit.

    • Side & rear bump-out additions
    • Internal conversion of basement or attic
    • Separate entrance, separate utilities optional
    • Fire-rated wall assemblies handled in-house
  • Item A-04

    Up to 500 sqft, in the main house.

    JADU (junior ADU)

    Carved from the existing house. Limited to 500 sqft. Owner-occupancy required on one of the two units. Often the fastest permit path and the lowest cost-per-sqft.

    • Up to 500 sqft within existing walls
    • Efficiency kitchen permitted
    • Shared sanitation OK with main house
    • Owner-occupancy deed restriction filed

From napkin to keys.

Five steps. Same on a $90k bath and a $1.2M whole-home.

  1. Week 0

    Site walk

    Free. We come out, you show us, we ask annoying questions.

  2. Week 1–2

    Feasibility & quote

    Setbacks, FAR, structural reality, and a real number — not a placeholder.

  3. Week 3–10

    Design + permits

    Architectural, structural, Title 24. We pull the permit; your name stays off the counter.

  4. Week 11–32

    Build

    One superintendent on-site daily. Weekly owner walk, photos every Friday.

  5. Final week

    Punch & handover

    Walk-through with your list, not ours. Two-year workmanship warranty starts the day you move back in.

What we won't do —

  • Track-home cookie-cutter builds
  • Anything we'd sub out 80% of (we self-perform framing & finish)
  • Below-cost competitive bids — we walk before we cut a corner
  • Projects without a permit — full stop

FAQ.

What's a real cost range for an LA kitchen or bath?

Kitchens land between $95k and $240k depending on size, structural work, and appliance package. Baths between $55k and $145k. ADUs start around $285k for a garage conversion and reach $650k+ for a detached two-story. We price each project line-by-line — no square-foot guesses.

How long does a remodel actually take?

From signed contract to occupancy: kitchens 8–12 weeks, baths 5–8 weeks, whole-home remodels 6–10 months, ADUs 4–7 months once permitted. LADBS and city-of-LA permits add 4–16 weeks depending on jurisdiction and scope.

Do you handle permits and design?

Yes. Architectural drawings, structural engineering, Title 24, and the LADBS / city permit application are all in-house or with our regular partners. Your name never goes on the counter at the building department.

Can you work with my architect?

Often. We have a short list of LA architects we love working with, and we're happy to review drawings from anyone — we'll flag constructability issues before you spend more on design.

Do you offer financing?

We don't lend, but we work regularly with three Southern California lenders that specialize in remodel and ADU loans (HELOC, RenoFi, construction-to-perm). Happy to make an intro at the feasibility stage.

What's the warranty?

Two years on workmanship from the day of final occupancy. Manufacturer warranties pass through to you on appliances, windows, roofing, and mechanical systems. We come back to fix our own work, no charge, no argument.

request a quote

Tell us what you’re building.

A few specifics — city, scope, budget, target date. We’ll come back with a one-page feasibility note within the week.

Phone or email — at least one so we can reply.

Prefer to chat first? Open the contact page →

Call