California Drainage & Waterproofing.
LA drainage — french drains, area drains, downspout extensions, sump pumps. Hillside homes get engineered solutions.
Bay drainage — hillside saturation, basement intrusion, foundation perimeter drains. Engineer-designed, permitted, warrantied.
Los Angeles
$4K – $35K
Surface french drain bottom; full basement system top.
Timeline — 3–7 days for typical drainage system.
Los Angeles Drainage & Waterproofing →San Francisco Bay Area
$6K – $55K
Bay hillside + heavy rain lift cost.
Timeline — 5–10 days including hillside coordination.
San Francisco Bay Area Drainage & Waterproofing →Scope — what we deliver.
- Site assessment
- Engineering if needed
- Permit
- Excavation + install
- Backfill + test
Permits look different in LA vs the Bay.
Los Angeles — permit notes
- Permit if connecting to public storm.
- Engineering on hillside.
- Discharge to street legal in LA.
Bay Area — permit notes
- Permit + stormwater compliance.
- Engineering common.
- Discharge regulations vary by city.
How we think about drainage & waterproofing.
Exterior work is moisture management, full stop. Roofing, siding, stucco, decks, and concrete all exist to move water away from the building before it has time to soak in. We detail every transition — roof-to-wall, wall-to-deck, deck-to-door — as if it will see a hose test, because in winter it will.
California climates are deceptively hard on exteriors. UV is brutal. Marine air corrodes fasteners. Wildfire embers land on debris in valleys. We default to WUI-compliant materials (Class A roofing, ⅛" mesh vents, ignition-resistant siding) on every exterior job, even where it's not yet required — it's $2–6K extra and it's the difference between a saved house and a lost one.
The schedule, written out.
Week 0
Inspection + scope
Roof + flashing inspection, moisture probe of siding, deck post + ledger check, photo documentation.
Week 1–2
Permits + material procurement
Permit (most cities require for re-roofs, additions, decks > 30" off grade); material delivery scheduled around rain forecast.
Week 2–4
Tear-off + dry-in
Selective demo, sheathing inspection, replace rotted decking, install underlayment + flashing.
Week 4–6
Install
Roof, siding, stucco scratch + brown + finish, deck framing + decking, concrete forms + pour.
Week 6–7
Trim + paint + seal
Trim, paint, sealant on penetrations, deck stain or color.
Week 7–8
Inspection + warranty
Final inspection, manufacturer warranty registration, owner walk.
Materials & assemblies.
| Component | Default spec | Why |
|---|---|---|
| Roofing | 30-yr architectural shingle, standing-seam metal, or single-ply TPO/PVC for low-slope | Standing-seam metal wins lifetime cost in most CA climates. |
| Underlayment | Synthetic underlayment + peel-and-stick ice-and-water at valleys and penetrations | 30-lb felt is no longer the right baseline. |
| Siding | Fiber cement (Hardie), engineered wood (LP SmartSide), or stucco with weep screed and 2-layer WRB | WRB layering is what controls 90% of stucco failures. |
| Deck framing | PT lumber for posts, joists, ledger; stainless or coated fasteners; flashing at ledger | Galvanized fasteners on PT lumber corrode in 5 years. |
| Decking | Composite (Trex, TimberTech), thermally modified hardwood, or kiln-dried IPE with hidden fasteners | Composite is the lowest-maintenance default for CA sun. |
| Concrete | 4000 psi mix, #4 rebar @ 16" o.c., proper expansion + control joints | Cracks come from poor jointing, not from the mix. |
Hidden costs we flag up front.
| Line item | Range | When it hits |
|---|---|---|
| Sheathing replacement | $8–$22/sqft | tear-off reveals rot or delaminated OSB |
| Deck ledger flashing repair | $1.5K–$6K | ledger was nailed, not bolted with flashing |
| Stucco crack repair (full re-skim) | $6K–$18K | 1980s synthetic stucco has reached end of life |
| Tree removal / overhead clearance | $1.5K–$8K | roof or wall access requires it |
| Permit (re-roof + structural) | $300–$2.5K | many cities now require for re-roof + decks |
cheaper alternatives
What we'd consider — and what we wouldn't.
Overlay re-roof (shingle over shingle)
30% cheaper but voids most warranties + traps moisture; never on a building you plan to keep.
EIFS over stucco
Better thermal but historically a moisture-management nightmare — only with rainscreen detail.
Pressure-treated decking
60% cheaper than composite but requires re-staining every 2 years to last.
pitfalls — takeover-job patterns
Mistakes to avoid.
- Skipping the moisture probe of stucco before scope-of-work — a 'paint job' turns into a $25K re-skim
- Mounting a deck ledger to siding without flashing — #1 source of catastrophic deck failure in CA
- Not detailing kick-out flashing at roof-to-wall — drives water behind the siding for years
- Installing concrete without proper joint spacing — random cracking that no patch will hide
Drainage & Waterproofing — Los Angeles.
Westside Drainage & Waterproofing
Local scope + permit →
Eastside / NELA Drainage & Waterproofing
Local scope + permit →
San Fernando Valley Drainage & Waterproofing
Local scope + permit →
South Bay Drainage & Waterproofing
Local scope + permit →
Hills & Canyons Drainage & Waterproofing
Local scope + permit →
San Gabriel Valley Drainage & Waterproofing
Local scope + permit →
Ventura County Drainage & Waterproofing
Local scope + permit →
Orange County Drainage & Waterproofing
Local scope + permit →
Inland Empire Drainage & Waterproofing
Local scope + permit →
Drainage & Waterproofing — Bay Area.
Oakland Drainage & Waterproofing
Local scope + permit →
Berkeley Drainage & Waterproofing
Local scope + permit →
Richmond Drainage & Waterproofing
Local scope + permit →
San Jose Drainage & Waterproofing
Local scope + permit →
Sunnyvale Drainage & Waterproofing
Local scope + permit →
Palo Alto Drainage & Waterproofing
Local scope + permit →
San Francisco Drainage & Waterproofing
Local scope + permit →
Fremont Drainage & Waterproofing
Local scope + permit →
Walnut Creek Drainage & Waterproofing
Local scope + permit →
Livermore Drainage & Waterproofing
Local scope + permit →
In short.
- Cost to install LA french drain?
- $4K–$12K typical perimeter drain.
- Basement waterproofing in LA?
- $15K–$35K for a full interior-exterior system.
- Bay hillside drainage cost?
- $10K–$30K. Engineering + permit + excavation.
- Wet SF basement fix?
- $20K–$55K for interior membrane + sump + exterior regrade.
More we build.
ADU Builder
California pillar →
Garage Conversion
California pillar →
JADU Builder
California pillar →
Kitchen Remodeling
California pillar →
Bathroom Remodeling
California pillar →
Home Additions
California pillar →
Whole-Home Remodeling
California pillar →
Detached ADU
California pillar →
Roofing
California pillar →
Concrete & Flatwork
California pillar →
Foundation
California pillar →
Seismic Retrofit
California pillar →
New Construction
California pillar →
Multifamily Remodeling
California pillar →
Commercial Tenant Improvement
California pillar →
Framing & Carpentry
California pillar →
Siding & Stucco
California pillar →
Windows & Doors
California pillar →
Decks & Patios
California pillar →
Electrical & Panel Upgrades
California pillar →
Plumbing & Repipes
California pillar →
HVAC & Heat Pumps
California pillar →
Interior & Exterior Painting
California pillar →
Got a drainage & waterproofing project in mind?
Send us the address. We'll pull local zoning, setbacks, and drainage & waterproofing feasibility before you spend on drawings.
Start a project →