California Roofing.

Tear-off to deck, replace soft sheathing, new underlayment, reroof in composition, concrete tile, or standing-seam metal. Title 24 cool-roof on every job.

Bay roofing — older homes carry 30–60 years of layered roofs. Full tear-off, rafter inspection, sheathing repair, GAF/CertainTeed/Owens Corning systems.

Los Angeles

$12K – $55K for 2,000 sqft house

Composition $12K–$22K; concrete tile $25K–$40K; metal $40K–$55K.

Timeline — 3–5 days composition; 5–7 days tile; 6–9 days metal.

Los Angeles Roofing

San Francisco Bay Area

$15K – $65K for 2,000 sqft house

Steep Bay roofs and hard access lift the band 15-25% over LA.

Timeline — 4–6 days composition; 6–8 days tile; 7–10 days metal.

San Francisco Bay Area Roofing

Scope — what we deliver.

  • Tear-off to deck
  • Sheathing repair
  • Underlayment + ice & water shield
  • Roofing install
  • Flashing, vents, gutters

Permits look different in LA vs the Bay.

Los Angeles — permit notes

  • LADBS permit required for any reroof.
  • Title 24 cool-roof per climate zone.
  • Class A fire rating in fire zones.
  • Existing solar detached + reset.

Bay Area — permit notes

  • Permit required.
  • Title 24 cool-roof.
  • WUI Class A + ember-resistant venting.
  • SF row-house scaffolding permits.

How we think about roofing.

Exterior work is moisture management, full stop. Roofing, siding, stucco, decks, and concrete all exist to move water away from the building before it has time to soak in. We detail every transition — roof-to-wall, wall-to-deck, deck-to-door — as if it will see a hose test, because in winter it will.

California climates are deceptively hard on exteriors. UV is brutal. Marine air corrodes fasteners. Wildfire embers land on debris in valleys. We default to WUI-compliant materials (Class A roofing, ⅛" mesh vents, ignition-resistant siding) on every exterior job, even where it's not yet required — it's $2–6K extra and it's the difference between a saved house and a lost one.

The schedule, written out.

  1. Week 0

    Inspection + scope

    Roof + flashing inspection, moisture probe of siding, deck post + ledger check, photo documentation.

  2. Week 1–2

    Permits + material procurement

    Permit (most cities require for re-roofs, additions, decks > 30" off grade); material delivery scheduled around rain forecast.

  3. Week 2–4

    Tear-off + dry-in

    Selective demo, sheathing inspection, replace rotted decking, install underlayment + flashing.

  4. Week 4–6

    Install

    Roof, siding, stucco scratch + brown + finish, deck framing + decking, concrete forms + pour.

  5. Week 6–7

    Trim + paint + seal

    Trim, paint, sealant on penetrations, deck stain or color.

  6. Week 7–8

    Inspection + warranty

    Final inspection, manufacturer warranty registration, owner walk.

Materials & assemblies.

ComponentDefault specWhy
Roofing30-yr architectural shingle, standing-seam metal, or single-ply TPO/PVC for low-slopeStanding-seam metal wins lifetime cost in most CA climates.
UnderlaymentSynthetic underlayment + peel-and-stick ice-and-water at valleys and penetrations30-lb felt is no longer the right baseline.
SidingFiber cement (Hardie), engineered wood (LP SmartSide), or stucco with weep screed and 2-layer WRBWRB layering is what controls 90% of stucco failures.
Deck framingPT lumber for posts, joists, ledger; stainless or coated fasteners; flashing at ledgerGalvanized fasteners on PT lumber corrode in 5 years.
DeckingComposite (Trex, TimberTech), thermally modified hardwood, or kiln-dried IPE with hidden fastenersComposite is the lowest-maintenance default for CA sun.
Concrete4000 psi mix, #4 rebar @ 16" o.c., proper expansion + control jointsCracks come from poor jointing, not from the mix.

Hidden costs we flag up front.

Line itemRangeWhen it hits
Sheathing replacement$8–$22/sqfttear-off reveals rot or delaminated OSB
Deck ledger flashing repair$1.5K–$6Kledger was nailed, not bolted with flashing
Stucco crack repair (full re-skim)$6K–$18K1980s synthetic stucco has reached end of life
Tree removal / overhead clearance$1.5K–$8Kroof or wall access requires it
Permit (re-roof + structural)$300–$2.5Kmany cities now require for re-roof + decks

cheaper alternatives

What we'd consider — and what we wouldn't.

  • Overlay re-roof (shingle over shingle)

    30% cheaper but voids most warranties + traps moisture; never on a building you plan to keep.

  • EIFS over stucco

    Better thermal but historically a moisture-management nightmare — only with rainscreen detail.

  • Pressure-treated decking

    60% cheaper than composite but requires re-staining every 2 years to last.

pitfalls — takeover-job patterns

Mistakes to avoid.

  • Skipping the moisture probe of stucco before scope-of-work — a 'paint job' turns into a $25K re-skim
  • Mounting a deck ledger to siding without flashing — #1 source of catastrophic deck failure in CA
  • Not detailing kick-out flashing at roof-to-wall — drives water behind the siding for years
  • Installing concrete without proper joint spacing — random cracking that no patch will hide

Cost benchmarks from our 2026 California report.

Ranges below are typical installed cost for owner-occupied residential work as of Q1 2026. Drawn from internal job tracking and validated against NAHB cost surveys.

ScopeLos AngelesBay AreaWhy the spread
Roof replacement (asphalt → cool comp)$9.5–$16.5$11–$19Title 24 cool-roof reflectance required across most of LA.

Ranges shown $/sqft unless the scope is a flat-fee item (panel, retrofit).

Where the permit actually gets pulled.

  • City

    City of Los Angeles

    Plan check
    1018 weeks
    Permit + fees
    $8.5K$22K

    Standard Plan Program offers preapproved detached ADU sets that cut review to ~4 weeks. JADUs are restricted to within the existing dwelling envelope. No owner-occupancy through 2025.

    Hillside Ordinance applies above the BHO line — adds geotech and grading review. Soft-story retrofit required for many pre-1978 multifamily.

    Full City of Los Angeles guide →LADBS online services

  • County

    Marin County (unincorporated)

    Plan check
    1222 weeks
    Permit + fees
    $9.5K$25K

    ADU streamlining for units ≤1,200 sqft. Septic system capacity is the most common deal-breaker on unincorporated parcels.

    WUI fire zones cover most of the county — Class A roof + ember-resistant vents required.

    Full Marin County (unincorporated) guide →Marin County permits

  • City

    Oakland

    Plan check
    1222 weeks
    Permit + fees
    $9.5K$26K

    Pre-approved ADU plans available. Wildland-Urban Interface zones in the hills require ember-resistant construction.

    Soft-story retrofit program active — confirm parcel status before purchase.

    Full Oakland guide →Oakland Accela portal

  • County

    Los Angeles County (unincorporated)

    Plan check
    816 weeks
    Permit + fees
    $7.5K$19K

    Unincorporated LA County uses a streamlined ADU plan check. School fees collected at final inspection — budget separately.

    Fire Hazard Severity Zone overlays apply in foothills — ignition-resistant construction required.

    Full Los Angeles County (unincorporated) guide →EPIC-LA self-service portal

When to do it yourself — and when not to.

SituationDIY-defensibleCall a licensed GC
Asphalt overlay (single layer, no leak history)Defensible if you can pull a re-roof permit and the deck is sound.Title 24 cool-roof documentation alone is a reason to hire — the inspector will reject undocumented work.
Tear-off + new comp shingle in a WUI zoneNot advisable — Chapter 7A vent, eave, and underlayment specs trip up most DIYers.Always. We use Class A assemblies and document each WUI-compliant component for the inspector.
Flat roof TPO/PVC over occupied spaceNo. Welded seams and parapet flashings require trained installers and manufacturer warranties.Yes — warranty validity depends on a certified installer.
Cool-roof recoating on a low-slope roofPossible for very small areas, but reflectance verification still requires CF-2R compliance.Worth it if the goal is Title 24 credit or rebate qualification.

What this is based on.

  1. 1.

    Title 24 Part 6 prescriptive cool-roof reflectance applies to roof replacements in CZ 8–15.

    California Energy Commission · view source

  2. 2.

    Chapter 7A ignition-resistant construction is mandatory in any Wildland-Urban Interface zone.

    California Building Standards Commission · view source

  3. 3.

    CAL FIRE Fire Hazard Severity Zone viewer determines whether 7A applies to a given parcel.

    CAL FIRE · view source

  4. 4.

    Class A roof assembly is the only acceptable assembly in a Very High FHSZ.

    California Office of the State Fire Marshal · view source

Roofing — Los Angeles.

Roofing — Bay Area.

In short.

How long does an LA composition reroof take?
3–5 days on a 2,000 sqft house.
Composition vs tile — what lasts longer in LA?
Tile 40–50 years vs composition 25–30. Tile costs 2x but lasts a lifetime.
What's roofing cost in SF?
$18K–$28K composition on a 1,800 sqft row house; $35K–$55K tile or metal.
Are there WUI roof requirements in Oakland Hills?
Yes — Class A + ember-resistant venting required.

Stay in the same trade

Related exterior construction services.

Same service, other region

Roofing across California.

Authority sources

Roofing — official California resources.

Primary sources we cross-reference on every project — agencies, utilities, and code bodies whose decisions actually move your permit and budget.

Ready to scope a California roofing project?

Send us the address. We’ll pull zoning, setbacks, and feasibility before you spend money on drawings — and the inquiry routes straight to the California desk.

Talk to the California desk →
Trade cardAfter hours · reply first thing tomorrow

Want a real number for your Roofing job?

  • We open the books on similar jobs from the last 24 months
  • Hand-built estimate, not a software auto-quote
  • Includes permits, finishes, and the boring stuff

3-day turnaround · Free

Compare scopes

Contact form · 30 seconds

or call (818) 650-3197

No spam. We reply personally — usually within 3 hours.

Call