California Roofing.
Tear-off to deck, replace soft sheathing, new underlayment, reroof in composition, concrete tile, or standing-seam metal. Title 24 cool-roof on every job.
Bay roofing — older homes carry 30–60 years of layered roofs. Full tear-off, rafter inspection, sheathing repair, GAF/CertainTeed/Owens Corning systems.
Los Angeles
$12K – $55K for 2,000 sqft house
Composition $12K–$22K; concrete tile $25K–$40K; metal $40K–$55K.
Timeline — 3–5 days composition; 5–7 days tile; 6–9 days metal.
Los Angeles Roofing →San Francisco Bay Area
$15K – $65K for 2,000 sqft house
Steep Bay roofs and hard access lift the band 15-25% over LA.
Timeline — 4–6 days composition; 6–8 days tile; 7–10 days metal.
San Francisco Bay Area Roofing →Scope — what we deliver.
- Tear-off to deck
- Sheathing repair
- Underlayment + ice & water shield
- Roofing install
- Flashing, vents, gutters
Permits look different in LA vs the Bay.
Los Angeles — permit notes
- LADBS permit required for any reroof.
- Title 24 cool-roof per climate zone.
- Class A fire rating in fire zones.
- Existing solar detached + reset.
Bay Area — permit notes
- Permit required.
- Title 24 cool-roof.
- WUI Class A + ember-resistant venting.
- SF row-house scaffolding permits.
How we think about roofing.
Exterior work is moisture management, full stop. Roofing, siding, stucco, decks, and concrete all exist to move water away from the building before it has time to soak in. We detail every transition — roof-to-wall, wall-to-deck, deck-to-door — as if it will see a hose test, because in winter it will.
California climates are deceptively hard on exteriors. UV is brutal. Marine air corrodes fasteners. Wildfire embers land on debris in valleys. We default to WUI-compliant materials (Class A roofing, ⅛" mesh vents, ignition-resistant siding) on every exterior job, even where it's not yet required — it's $2–6K extra and it's the difference between a saved house and a lost one.
The schedule, written out.
Week 0
Inspection + scope
Roof + flashing inspection, moisture probe of siding, deck post + ledger check, photo documentation.
Week 1–2
Permits + material procurement
Permit (most cities require for re-roofs, additions, decks > 30" off grade); material delivery scheduled around rain forecast.
Week 2–4
Tear-off + dry-in
Selective demo, sheathing inspection, replace rotted decking, install underlayment + flashing.
Week 4–6
Install
Roof, siding, stucco scratch + brown + finish, deck framing + decking, concrete forms + pour.
Week 6–7
Trim + paint + seal
Trim, paint, sealant on penetrations, deck stain or color.
Week 7–8
Inspection + warranty
Final inspection, manufacturer warranty registration, owner walk.
Materials & assemblies.
| Component | Default spec | Why |
|---|---|---|
| Roofing | 30-yr architectural shingle, standing-seam metal, or single-ply TPO/PVC for low-slope | Standing-seam metal wins lifetime cost in most CA climates. |
| Underlayment | Synthetic underlayment + peel-and-stick ice-and-water at valleys and penetrations | 30-lb felt is no longer the right baseline. |
| Siding | Fiber cement (Hardie), engineered wood (LP SmartSide), or stucco with weep screed and 2-layer WRB | WRB layering is what controls 90% of stucco failures. |
| Deck framing | PT lumber for posts, joists, ledger; stainless or coated fasteners; flashing at ledger | Galvanized fasteners on PT lumber corrode in 5 years. |
| Decking | Composite (Trex, TimberTech), thermally modified hardwood, or kiln-dried IPE with hidden fasteners | Composite is the lowest-maintenance default for CA sun. |
| Concrete | 4000 psi mix, #4 rebar @ 16" o.c., proper expansion + control joints | Cracks come from poor jointing, not from the mix. |
Hidden costs we flag up front.
| Line item | Range | When it hits |
|---|---|---|
| Sheathing replacement | $8–$22/sqft | tear-off reveals rot or delaminated OSB |
| Deck ledger flashing repair | $1.5K–$6K | ledger was nailed, not bolted with flashing |
| Stucco crack repair (full re-skim) | $6K–$18K | 1980s synthetic stucco has reached end of life |
| Tree removal / overhead clearance | $1.5K–$8K | roof or wall access requires it |
| Permit (re-roof + structural) | $300–$2.5K | many cities now require for re-roof + decks |
cheaper alternatives
What we'd consider — and what we wouldn't.
Overlay re-roof (shingle over shingle)
30% cheaper but voids most warranties + traps moisture; never on a building you plan to keep.
EIFS over stucco
Better thermal but historically a moisture-management nightmare — only with rainscreen detail.
Pressure-treated decking
60% cheaper than composite but requires re-staining every 2 years to last.
pitfalls — takeover-job patterns
Mistakes to avoid.
- Skipping the moisture probe of stucco before scope-of-work — a 'paint job' turns into a $25K re-skim
- Mounting a deck ledger to siding without flashing — #1 source of catastrophic deck failure in CA
- Not detailing kick-out flashing at roof-to-wall — drives water behind the siding for years
- Installing concrete without proper joint spacing — random cracking that no patch will hide
Roofing — Los Angeles.
Westside Roofing
Local scope + permit →
Eastside / NELA Roofing
Local scope + permit →
San Fernando Valley Roofing
Local scope + permit →
South Bay Roofing
Local scope + permit →
Hills & Canyons Roofing
Local scope + permit →
San Gabriel Valley Roofing
Local scope + permit →
Ventura County Roofing
Local scope + permit →
Orange County Roofing
Local scope + permit →
Inland Empire Roofing
Local scope + permit →
Roofing — Bay Area.
Oakland Roofing
Local scope + permit →
Berkeley Roofing
Local scope + permit →
Richmond Roofing
Local scope + permit →
San Jose Roofing
Local scope + permit →
Sunnyvale Roofing
Local scope + permit →
Palo Alto Roofing
Local scope + permit →
San Francisco Roofing
Local scope + permit →
Fremont Roofing
Local scope + permit →
Walnut Creek Roofing
Local scope + permit →
Livermore Roofing
Local scope + permit →
In short.
- How long does an LA composition reroof take?
- 3–5 days on a 2,000 sqft house.
- Composition vs tile — what lasts longer in LA?
- Tile 40–50 years vs composition 25–30. Tile costs 2x but lasts a lifetime.
- What's roofing cost in SF?
- $18K–$28K composition on a 1,800 sqft row house; $35K–$55K tile or metal.
- Are there WUI roof requirements in Oakland Hills?
- Yes — Class A + ember-resistant venting required.
More we build.
ADU Builder
California pillar →
Garage Conversion
California pillar →
JADU Builder
California pillar →
Kitchen Remodeling
California pillar →
Bathroom Remodeling
California pillar →
Home Additions
California pillar →
Whole-Home Remodeling
California pillar →
Detached ADU
California pillar →
Concrete & Flatwork
California pillar →
Foundation
California pillar →
Seismic Retrofit
California pillar →
New Construction
California pillar →
Multifamily Remodeling
California pillar →
Commercial Tenant Improvement
California pillar →
Framing & Carpentry
California pillar →
Siding & Stucco
California pillar →
Windows & Doors
California pillar →
Decks & Patios
California pillar →
Electrical & Panel Upgrades
California pillar →
Plumbing & Repipes
California pillar →
HVAC & Heat Pumps
California pillar →
Interior & Exterior Painting
California pillar →
Drainage & Waterproofing
California pillar →
Got a roofing project in mind?
Send us the address. We'll pull local zoning, setbacks, and roofing feasibility before you spend on drawings.
Start a project →