Skip to main content

Bay Area ADUs,
additions & remodels.

From San Francisco and Oakland to Walnut Creek, Fremont, San Jose, Palo Alto, Richmond, Antioch, and Livermore, Alpha Dream Construction designs and builds permit-ready ADUs, garage conversions, additions, kitchens, baths, and full-home remodels.

The Bay, on paper.

Our Bay Area crews cover the core Bay and selected surrounding cities, depending on project size, permit complexity, and schedule.

San RafaelNovatoVallejoHerculesRichmondBerkeleyOaklandSan LeandroWalnut CreekConcordAntiochPleasantonLivermoreHaywardFremontMilpitasDaly CitySan FranciscoSouth San FranciscoSan MateoRedwood CityPalo AltoMountain ViewSunnyvaleSanta ClaraSan JoseN
Bay Area service-area map — Alpha Dream Construction covers Novato, Vacaville, Fairfield, Vallejo, Hercules, Richmond, Berkeley, Oakland, Walnut Creek, Antioch, Livermore, Hayward, Fremont, San Francisco, South San Francisco, Palo Alto, Sunnyvale, San Jose, Prunedale, and Salinas.
  • San Rafael
  • Novato
  • Vallejo
  • Hercules
  • Richmond
  • Berkeley
  • Oakland
  • San Leandro
  • Walnut Creek
  • Concord
  • Antioch
  • Pleasanton
  • Livermore
  • Hayward
  • Fremont
  • Milpitas
  • Daly City
  • San Francisco
  • South San Francisco
  • San Mateo
  • Redwood City
  • Palo Alto
  • Mountain View
  • Sunnyvale
  • Santa Clara
  • San Jose

What the Bay studio builds.

  • Detached ADUs

    Backyard cottages, rental units, guest houses, and family housing.

  • Garage Conversions

    Convert existing garage space into legal, comfortable living space.

  • Home Additions

    Bedroom additions, second-story planning, expanded kitchens, family rooms.

  • Kitchen Remodels

    Layout reworks, cabinets, counters, lighting, plumbing, finish upgrades.

  • Bathroom Remodels

    Tile, waterproofing, vanities, lighting, showers, tubs, luxury finishes.

  • Whole-Home Remodels

    Full interior rebuilds, structural changes, MEP upgrades, finish packages.

Permit notes, by city.

Every Bay city has its own permit rhythm, water utility, and hillside rules. We keep a short field note on each one.

Bay Area construction is not one city.
It is many permit worlds.

San Francisco, Oakland, San Jose, Fremont, Walnut Creek, Palo Alto, and surrounding cities each review ADUs and remodels differently. We help homeowners understand feasibility, site conditions, utility issues, access, parking, fire separation, and inspection sequencing before construction starts.

From the Bay binder.

These are concept studies for upcoming Bay Area projects — real photography lands as each one wraps.

  • Project study

    Oakland Garage Conversion

    Oakland, CA

    480 sqft · rental-ready studio concept

    Garage conversion · ADU permit · MEP rework · radiant floor

  • Project study

    San Jose Detached ADU

    San Jose, CA

    720 sqft · backyard family unit

    Detached ADU · foundation · framing · plumbing · finishes

  • Project study

    Walnut Creek Kitchen Remodel

    Walnut Creek, CA

    Open-plan kitchen with structural beam work

    Structural beam · cabinetry · stone counters · lighting

  • Project study

    Fremont Bathroom Suite

    Fremont, CA

    Full waterproofing, tile, lighting, and vanity upgrade

    Waterproofing · tile · vanity · skylight · brass fixtures

The Bay, in short.

How much does an ADU cost in the Bay Area?
Most detached ADUs in the Bay Area land between $350K and $550K all-in, depending on lot access, utility runs, and finish level. Garage conversions typically run $180K–$280K. We give a one-page feasibility note before contracting so the number isn't a surprise.
Do you help with permits?
Yes — we handle the full plan set, structural calcs, Title 24 energy compliance, and the back-and-forth with the local planning and building departments. The homeowner only signs.
Do you work in San Francisco?
Yes. San Francisco ADUs and remodels have their own quirks — Planning Department review, neighbor notification, sloped lots, and tight street access. We've built the workflow around them.
Do you work in San Jose?
Yes. San Jose's pre-approved ADU program can shorten permitting significantly, and we use it whenever the lot fits. Custom plans are also available when the standard footprint won't work.
Can you convert my garage into an ADU?
Usually yes — California state law strongly favors garage-to-ADU conversions, and most Bay Area cities allow them as-of-right. We confirm setbacks, fire separation, and existing slab condition before committing.
Do you handle design and construction?
Yes — we're a design-build studio. One team draws it, prices it, permits it, and builds it. No three-way blame triangles between architect, contractor, and homeowner.
How long does a Bay Area ADU take?
Typical timeline is 3–5 months for permitting plus 4–6 months on site, depending on the jurisdiction. San Jose's pre-approved program can cut the permit window in half.
Can you check if my property qualifies?
Yes — send us the address and we'll pull zoning, setbacks, FAR, and any historic or hillside overlays before you spend money on drawings.

From the Bay Area binder.

  • Backyard ADU · 2025

    They walked our Oakland lot, came back with a one-page feasibility note, and the number held through close-out. No drama.

    P. & S. Chen · Oakland

  • Garage conversion · 2025

    Permits in San Jose moved fast because they used the pre-approved program. We were on site within the quarter.

    Adrian M. · San Jose

  • Whole-home remodel · 2025

    Walnut Creek hillside lot, tight access, two existing trees to protect. The crew solved every constraint cleanly.

    Dr. R. Patel · Walnut Creek

Pick your side of the bay.

Permits, soils, and timelines change block-to-block across the bay. Each sub-region page covers the cities, permit notes, and lot conditions we see there.

Got a Bay Area lot in mind?

Send us the address and we’ll pull zoning, setbacks, and ADU eligibility before you spend money on drawings.

Start a Bay Area project →

FAQ

Bay Area FAQ

How fast can I get an ADU permit in San Francisco?

SF DBI's ministerial clock is technically 60 days, but utility coordination (PG&E service, SFPUC sewer lateral compliance) adds 60–120 days outside the clock. Realistic plan-to-issued is 4–7 months in SF — faster than most owners expect, but only if utility prep starts on day one.

Why do Bay Area ADUs cost more than LA?

Three reasons: labor rates are 18–25% higher, hillside foundations are more common (drilled piers vs. slab on grade), and utility upgrades are harder (PG&E service upgrades commonly run $12K–$45K, often more in SF). Total premium is typically 20–30% over LA at the same square footage and finish level.

What's soft-story compliance and will it affect my project?

A San Francisco and Berkeley program requiring seismic retrofit of wood-frame buildings with weak ground-floor structures (typically buildings with parking or large openings under living space). If your building falls under the ordinance, you'll either need to complete retrofit first or do it concurrently with the ADU.

Do you work on the Peninsula and South Bay?

Yes — Palo Alto, Mountain View, Sunnyvale, Cupertino, San Jose, Los Altos, Menlo Park, Redwood City, San Mateo. Each has its own quirks: Palo Alto enforces design review heavily, Cupertino has aggressive FAR rules, San Jose is the fastest permit office in the South Bay.

Can you do an ADU in the East Bay flats vs. East Bay hills?

Yes to both. Flats (parts of Oakland, Berkeley, Albany, Alameda) are fast and cheap — slab foundations, simple utility runs. Hills (Berkeley Hills, Oakland Hills, Piedmont) need drilled piers, retaining walls, and grading permits — typically add 3–4 months and $80K–$200K.

Do you handle Marin County permits?

Yes — primarily Mill Valley, Larkspur, San Rafael, and unincorporated Marin. Marin tends to be stricter on hillside grading and septic-to-sewer requirements than the rest of the Bay Area. Budget extra time and a soils investigation.

What's the cost difference between SF and the East Bay?

SF is typically 15–25% more expensive than Oakland or Berkeley for the same scope. The premium covers parking-permit logistics, narrower lots requiring more careful staging, and SFPUC fees that don't exist across the bay.

How does PG&E coordination work on a Bay Area ADU?

If your new ADU needs a service upgrade (most do), you submit a Service Planning Application to PG&E — they're currently quoting 60–120 days to design and 90–180 days to install. Start it the week you submit the building permit; don't wait for permit issuance.

Call